Michael Walberg
Director - Business Development U.S. Engineering
Seminars
Wednesday 3rd June 2026
Case Study: Delivering Multi-Trade Prefab at Scale to Reduce Labor Demand & Deliver Projects Faster
10:50 am
- Calculating when multi-trade prefab meaningfully reduces onsite labor and peak manpower, and identifying the project conditions where offsite work delivers the greatest advantage
- Streamlining the BIM-to-shop-to-field process by defining handoff expectations, locking design earlier, and creating consistent workflows that support efficient fabrication and installation across geographically distributed fabrication and field teams
- Driving coordinated multi-trade execution by aligning tolerances, sequencing needs, and collaboration rhythms to ensure assemblies fit, perform, and install smoothly in the field despite site-specific access, weather, or logistics constraints
Wednesday 3rd June 2026
Panel: Defining the Next Generation Data Centers to Build More Efficient & Scalable Facilities
2:00 pm
- Exploring how rapid technology evolution is reshaping facility design and the speed at which new chip prototypes become standard
- Projecting what data centers will look like in the next 3–5 years, including shifts in compute demand, rack density, modularity, and AI-driven operational models
- Identifying the internal strategies owners are using to reduce total power demand, from chip-level efficiency to cooling innovation and smarter load management
- Understanding how operators are preparing for limited-power geographies, and what design or operational changes will allow builds to expand into regions with minimal grid capacity