Driving Faster Data Center Delivery Through Integrated Digital-to-Physical Prefabrication Workflows
12:00 pm - Wednesday 3rd June 2026
- Sharing how integrating automation, fabrication technology, and connected workflows has enabled teams to stay ahead of aggressive owner and GC timelines across large-scale data center projects
- Reducing the time required to transfer assembled model data into the prefab shop by replacing traditional shop drawings with digital shop-floor viewing systems
- Driving fabricatable model information directly into prefab machinery, including Scotchman Saw Printing Systems and Crippa CNC tube benders, to improve precision and production speed
- Utilizing machine automation and inkjet marking technologies to streamline rack preassembly, reduce manual handling, and improve installation readiness