Mike Walberg

Director U.S. Engineering

Seminars

Wednesday 3rd June 2026
Panel: Defining the Next Generation Data Centers to Build More Efficient & Scalable Facilities
1:30 pm
  • Exploring how rapid technology evolution is reshaping facility design and the speed at which new chip prototypes become standard
  • Projecting what data centers will look like in the next 3–5 years, including shifts in compute demand, rack density, modularity, and AI-driven operational models
  • Identifying the internal strategies owners are using to reduce total power demand, from chip-level efficiency to cooling innovation and smarter load management
  • Understanding how operators are preparing for limited-power geographies, and what design or operational changes will allow builds to expand into regions with minimal grid capacity
Wednesday 3rd June 2026
Case Study: Delivering Multi-Trade Prefab at Scale to Reduce Labor Demand & Deliver Projects Faster
11:00 am
  • Calculating when multi-trade prefab meaningfully reduces onsite labor and peak manpower, and identifying the project conditions where offsite work delivers the greatest advantage
  • Streamlining the BIM-to-shop-to-field process by defining handoff expectations, locking design earlier, and creating consistent workflows that support efficient fabrication and installation across geographically distributed fabrication and field teams
  • Driving coordinated multi-trade execution by aligning tolerances, sequencing needs, and collaboration rhythms to ensure assemblies fit, perform, and install smoothly in the field despite site-specific access, weather, or logistics constraints
Michael Walberg.