Michal Kazmirak

Michal Kazmirak

Company: Aldridge Electric

Job title: Vice President - Mission Critical

Seminars:

Scaling Volumetric Modular & Prefabricated Systems for Enhanced Efficiency & Labor Optimization 1:01 pm

This workshop will gather experts to discuss: Key design-phase decisions and timelines that enable successful modular delivery Breaking down the on-site installation process, including logistics of delivery, staging, and integration with base building infrastructure Which components are best suited for prefabrication and to which scale: What are the prime conditions for modular vs. component-based prefabrication?Read more

day: Pre-Conference Workshop Day

A Hanson Wade Group Company

© Copyright 2025 Hanson Wade | Design and site by Event Engine | Hanson Wade Limited is registered in England & Wales, number 06752216.
Registered Office: Eastcastle House, 27/28 Eastcastle Street, London, W1W 8DH.